|
Server : Apache/2.4.62 System : FreeBSD fbsdweb2.web.rcn.net 14.1-RELEASE FreeBSD 14.1-RELEASE releng/14.1-n267679-10e31f0946d8 GENERIC amd64 User : www ( 80) PHP Version : 8.3.8 Disable Function : NONE Directory : /domains/astrosfm/AAS_meetings/1997_winter/abstracts/ |
Upload File : |
<h2>AAS 97-139</h2> <h2>SIMULTANEOUS DEPLOYMENT OF A CABLE FROM TWO MOVING PLATFORMS </h2> <h4> S. Djerassi and H. Bamberger, Haifa, Israel </h4> <h2> Abstract </h2> The present paper deals with the deployment of a cable from two moving platforms. The cable is regarded as a collection of links whose number increases with time. An order-n algorithm is constructed for the simulation of motion of the cable during deployment, incorporating a novel, three pass procedure for the identification of constraint forces appearing in the equations of motion, and a procedure for the release of the cable from both platforms. The algorithm is described, and the use of the association simulation program is illustrated by means of an example.